HomeADU › ADU Builders Near Me

ADU Builders Near Me

Why 'near me' matters less than you think for factory-built ADUs, and what freight and crane access actually add.

If you are searching for adu builders near me, you have already made the decision to build. What is left is choosing who builds it, and that choice is usually made on a number that is not comparable between bids. This page publishes ours.

An accessory dwelling unit is a second, self-contained living unit on a lot that already has a primary home — the industry term for what most people call a granny flat, in-law suite, backyard cottage, casita or garage apartment. It has its own kitchen, its own bathroom, its own entrance, and in most jurisdictions its own address and utility meter.

Three forms exist and they are not interchangeable on cost. A detached unit is a separate structure in the yard and is where factory-built wins hardest, because the whole building arrives finished. An attached unit shares a wall with the main house and carries structural tie-in work. A conversion turns an existing garage or basement into a dwelling and looks cheap until you price bringing an uninsulated slab, a low ceiling and a non-conforming header up to habitable code.

What it actually costs

Published pricing against a national builder's own published pricing.

FootprintLayoutOur turnkeyNational builder publishedDifference
385 sq ftStudio$232,000$298,800$66,800
500 sq ft1 bed / 1 bath$253,000$324,800$71,800
640 sq ft1 bed + office$278,000
800 sq ft2 bed / 2 bath$312,000$424,800$112,800
1,000 sq ft2 bed + great room$341,000
1,195 sq ft3 bed / 3 bath$374,000$498,800$124,800

Comparison column reflects a national turnkey ADU builder's own published fixed-price list as of 2026. Both columns are all-in scopes covering design, permitting, foundation, delivery, set and utility connection. Our figures are budgeting estimates; a confirmed number requires a site address.

Finish tiers

The base rate moves with the specification, not with the sales conversation.

Finish tierBase rateWhat it includes
Essential$265/sq ftPainted drywall, LVP flooring, stock cabinetry, standard appliance package, single-hung windows
Signature$325/sq ftQuartz counters, tile wet areas, soft-close cabinetry, stainless appliances, black-framed sliding glass
Premium$395/sq ftFull-height tile, custom millwork, panel-ready appliances, wide-format glazing, cedar soffit detailing

Site costs — the part most bids omit

These are real and they are yours whether or not the quote mentions them.

Line itemTypical costWhat drives it
Foundation$38–52 per sq ftPier and beam at the low end, full stem wall or slab at the high end. Soil type and frost depth decide.
Site survey$5,400Required before permit in nearly every jurisdiction. Locates setbacks, easements and utility runs.
Permitting$8,900Plan review, permit issuance and inspection fees. Ministerial-approval states run lower.
Lot clearing$4,200Vegetation removal and grading for the pad and the crane or truck path.
Utility trenching$185 per linear foot past 50 ftWater, sewer and electrical from the main house or the street. This is the line most quotes omit.
Crane set$8,600Required when truck access cannot reach the pad, or for any second-story module.
Freight$6.80 per loaded mileFrom the fabrication facility to your address. Long hauls and permit loads add escort cost.
Utility connection$3,800–11,400Meter, panel and tie-in. Varies most with distance and whether a service upgrade is triggered.

The reason two ADU bids can differ by sixty thousand dollars on identical units is almost never the building. It is which of the rows above sit inside the number and which arrive later as change orders. When you compare bids, the only question worth asking is: which of these eight lines is included, and at what allowance?

How to vet a builder

Seven questions separate a real operation from a broker with a website:

  1. Is the unit built under a state industrialized-building program, and can you show me the label? A state label means the structure was inspected in the factory and the local jurisdiction reviews only foundation and utilities.
  2. What is your published price per square foot by finish tier? If the answer is "it depends," the bid will keep depending.
  3. Which of the eight site-cost lines above are inside your number?
  4. Who pulls the permit, and does your price include the fees?
  5. What is the current production window, and what moves it? A builder who quotes a fixed date regardless of your configuration is quoting a sales number.
  6. Truck set or crane set, and who determines that? A site walk answers this. A phone call does not.
  7. What happens if the utility tie-in triggers a service upgrade? This is the single most common surprise on an ADU project.

Production window

Slot-based, not a fixed promise.

A factory runs a queue. When you reserve a slot you are buying a position in that queue, and the honest answer to "how fast" depends on three things: how many slots are already committed, the lead time on the specific materials your configuration calls for, and whether your permit clears before your slot opens.

Current windows run 30 to 90 days from released engineering to delivery for standard configurations. Smaller units with Essential finishes sit at the fast end. Anything with a ballistic package, a hurricane-rated envelope, custom glazing or a second story sits at the slow end because those components have their own supply lead times.

The reason this beats a site-built schedule is not that the factory works faster on any given day. It is that permitting and fabrication run in parallel instead of in sequence, and the on-site set is measured in hours rather than months. Weather stops a framing crew; it does not stop a production line.

Windows move with demand and material availability. A slot quoted today holds while capacity lasts.

ADU law by state

Fifteen states have statutes that materially change what you can build. These are the ones where the law, not the local planner, decides.

ADU questions

What does ADU stand for?
Accessory Dwelling Unit. It is the legal and zoning term for a second self-contained residence on a lot with an existing primary home. Granny flat, in-law suite, casita, backyard cottage and garage apartment all describe the same thing in ordinary language.
How much does an ADU builders near me cost?
A 385 sq ft studio runs about $232,000 turnkey and a 1,195 sq ft three-bedroom runs about $374,000, both including design, permitting, foundation, delivery, set and utility connection. Published national turnkey pricing for the same footprints is $298,800 and $498,800.
Is a garage conversion cheaper than a new detached unit?
Frequently not. A conversion inherits an uninsulated slab, a ceiling height that may not meet habitable minimums, a header that was never sized for a door opening, and no independent utility service. Once those are corrected the cost often lands within ten percent of a new detached unit that arrives finished and carries a warranty.
How long does an ADU take?
Current production windows run 30 to 90 days from released engineering to delivery, and the on-site set is measured in hours. The window is slot-based: it depends on queue position, the material lead times your specific configuration calls for, and whether your permit clears before the slot opens.
Do I need owner-occupancy to build one?
In most states with an ADU statute, no — California, Washington, Oregon, Colorado, Arizona and Massachusetts all specifically prohibit owner-occupancy conditions on permits. Where no statute exists it is a local zoning question.
Can I rent it out?
Long-term rental is allowed essentially everywhere an ADU is allowed. Short-term rental is the restricted use — several jurisdictions permit the unit but prohibit or cap stays under 30 days, so check the ordinance before you underwrite the income.
Will it appraise?
In mature ADU markets — Los Angeles, Portland, Seattle, Denver — appraisers have comparable sales and the unit contributes measurable value. In markets where accessory units are still rare, expect the appraisal to lag the construction cost for the first few years.

Get a ADU Builders Near Me quote

Tell us the scope and the ZIP. You get a real delivered-and-installed number, not a "contact us for pricing" runaround.

Or call/text (954) 488-0700. Photos and a site address get the fastest confirmed number.

More on ADUs

More from the network

We run a group of focused sites so you land on the one that matches what you actually need instead of a catch-all catalog.